With these needs in mind, the decision has been made to conduct a capital campaign that will reach
out to all of our friends and supporters with an appeal for financial support.
Our goals for our campaign are:
Celebration Goal $ 650,000
Reaching our celebration goal would allow us to increase funding in the
Routt High School Education Foundation, replace the lower lobby roof
of the high school, and have funds available to repair the dome and upper
school roofs, address the kitchen sewer problem, and repair foundation
leaks in the Martha Routt Room.
Challenge Goal $ 800,000
If we are fortunate enough to meet our celebration goal, our next item on
the priority list is to replace the dome roof on the gymnasium. Leaks are
present that if not fixed will damage the gym floor. At a minimum, the leaks
need to be patched, as included above. However, if we raise the additional
funds, instead of patching the roof, we can replace it at an estimated cost of
$150,000.
If we surpass even our challenge goal, the additional funds will be directed to the Routt High School
Education Foundation.